Installing Prehung Doors
Positioning and Leveling the Frame
Position the frame in the rough opening.
Visually center the top of the frame in the opening.
Level the top of the frame and tack it into place by nailing through the trim with 4d finishing nails. DO NOT drive nails all the way through.
Page 2 of 12