Installing Prehung Doors

Positioning and Leveling the Frame

  • Position the frame in the rough opening.  
  • Visually center the top of the frame in the opening.
  • Level the top of the frame and tack it into place by nailing through the trim with 4d finishing nails.  DO NOT drive nails all the way through. 

Page 2 of 12